North Railroad Ave over Milton Creek
FairPosted for loadColumbia County, Oregon · Port of St. Helens · Structure no. 21280 000000000
- Built
- 1999
- 26 years old
- Condition
- Fair
- inspected September 2023
- Type
- Truss - Thru
- Steel
- Length
- 170 ft
- 1 main span
- Daily traffic
- 63
- 2020 count
- Owner
- State
- Other State Agency
About this bridge
North Railroad Ave over Milton Creek is a steel truss - thru carrying North Railroad Ave over Milton Creek in Columbia County, Oregon. It was built in 1999, so it is 26 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 63 vehicles a day, roughly 1% of them trucks, projected to reach 70 by 2025. The structure is 170 ft (51.8 m) long and 14 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was North Railroad Ave over Milton Creek built?
It was built in 1999, making it 26 years old in 2025.
What condition is North Railroad Ave over Milton Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does North Railroad Ave over Milton Creek carry?
About 63 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is North Railroad Ave over Milton Creek?
The structure is 170 ft (51.8 m) long with a longest span of 130 ft (39.6 m) and a deck 14 ft wide.
Who owns North Railroad Ave over Milton Creek?
It is owned by the Other State Agency.