US Bridges

Nehalem Street over Clatskanie River

FairPosted for load

Columbia County, Oregon · Clatskanie N City Limits · Structure no. 09B03 000 00015

Built
1934
91 years old, rebuilt 1982
Condition
Fair
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
99 ft
2 main spans
Daily traffic
6,189
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Nehalem Street over Clatskanie River is a steel stringer/multi-beam or girder carrying Nehalem Street over Clatskanie River in Columbia County, Oregon. It was built in 1934 and reconstructed in 1982, so it is 91 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 6,189 vehicles a day, roughly 20% of them trucks, projected to reach 6,799 by 2025. The structure is 99 ft (30.2 m) long and 52 ft wide. If it were closed, the detour would be 10.6 mi (17 km).

CarriesNehalem Street
CrossesClatskanie River
LocationClatskanie N City Limits
RouteCity Street A0757
StateOregon
Coordinates46.10581, -123.20178
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating22.2 US tons
Inventory rating17.2 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length99 ft (30.2 m)
Longest span70 ft (21.3 m)
Deck width52 ft (16 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,189 (2020)
Projected traffic6,799 by 2025
Trucks20%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed10.6 mi (17 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Nehalem Street over Clatskanie River built?

It was built in 1934, making it 91 years old in 2025. It was reconstructed in 1982.

What condition is Nehalem Street over Clatskanie River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does Nehalem Street over Clatskanie River carry?

About 6,189 vehicles per day (2020 count), of which roughly 20% are trucks.

How long is Nehalem Street over Clatskanie River?

The structure is 99 ft (30.2 m) long with a longest span of 70 ft (21.3 m) and a deck 52 ft wide.

Who owns Nehalem Street over Clatskanie River?

It is owned by the City or Municipal Highway Agency.