Or 99E (hwy 81) over Partial Viaduct
FairClackamas County, Oregon · In Oregon City · Structure no. 02732 01E 01222
- Built
- 1940
- 85 years old
- Condition
- Fair
- inspected November 2024
- Type
- Tee Beam
- Concrete Continuous
- Length
- 336 ft
- 11 main spans
- Daily traffic
- 19,677
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Or 99E (hwy 81) over Partial Viaduct is a concrete continuous tee beam carrying Or 99E (hwy 81) over Partial Viaduct in Clackamas County, Oregon. It was built in 1940, so it is 85 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 19,677 vehicles a day, roughly 1% of them trucks, projected to reach 25,600 by 2042. The structure is 336 ft (102.4 m) long and 16 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Or 99E (hwy 81) over Partial Viaduct built?
It was built in 1940, making it 85 years old in 2025.
What condition is Or 99E (hwy 81) over Partial Viaduct in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Or 99E (hwy 81) over Partial Viaduct carry?
About 19,677 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Or 99E (hwy 81) over Partial Viaduct?
The structure is 336 ft (102.4 m) long with a longest span of 33 ft (10.1 m) and a deck 16 ft wide.
Who owns Or 99E (hwy 81) over Partial Viaduct?
It is owned by the State Highway Agency.