Petes Mountain RD over Tualatin River
FairClackamas County, Oregon · 0.2 MI from Willamette R. · Structure no. 01654A003 00354
- Built
- 1977
- 48 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 394 ft
- 3 main spans
- Daily traffic
- 2,060
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Petes Mountain RD over Tualatin River is a prestressed concrete stringer/multi-beam or girder carrying Petes Mountain RD over Tualatin River in Clackamas County, Oregon. It was built in 1977, so it is 48 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,060 vehicles a day, roughly 14% of them trucks, projected to reach 2,090 by 2025. The structure is 394 ft (120.1 m) long and 41 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Petes Mountain RD over Tualatin River built?
It was built in 1977, making it 48 years old in 2025.
What condition is Petes Mountain RD over Tualatin River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does Petes Mountain RD over Tualatin River carry?
About 2,060 vehicles per day (2020 count), of which roughly 14% are trucks.
How long is Petes Mountain RD over Tualatin River?
The structure is 394 ft (120.1 m) long with a longest span of 130 ft (39.6 m) and a deck 41 ft wide.
Who owns Petes Mountain RD over Tualatin River?
It is owned by the County Highway Agency.