14 S 06 W 34.01: over South Fork Alsea River
GoodPosted for loadBenton County, Oregon · 0.9 Miles S of HWY 34 (mp · Structure no. 0000000L1439345
- Built
- 1966
- 59 years old
- Condition
- Good
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete Continuous
- Length
- 105 ft
- 3 main spans
- Daily traffic
- 100
- 2024 count
- Owner
- Federal
- Bureau of Land Management
About this bridge
14 S 06 W 34.01: over South Fork Alsea River is a concrete continuous stringer/multi-beam or girder carrying 14 S 06 W 34.01: over South Fork Alsea River in Benton County, Oregon. It was built in 1966, so it is 59 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 150 by 2044. The structure is 105 ft (32 m) long and 29 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 14 S 06 W 34.01: over South Fork Alsea River built?
It was built in 1966, making it 59 years old in 2025.
What condition is 14 S 06 W 34.01: over South Fork Alsea River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does 14 S 06 W 34.01: over South Fork Alsea River carry?
About 100 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is 14 S 06 W 34.01: over South Fork Alsea River?
The structure is 105 ft (32 m) long with a longest span of 65 ft (19.8 m) and a deck 29 ft wide.
Who owns 14 S 06 W 34.01: over South Fork Alsea River?
It is owned by the Bureau of Land Management.