Or 7 (hwy 071) over Powder River (rancheria)
FairBaker County, Oregon · 9.8 Mi. S. Jct. US 30 · Structure no. 20720 071 04166
- Built
- 2010
- 15 years old
- Condition
- Fair
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 97 ft
- 1 main span
- Daily traffic
- 1,340
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Or 7 (hwy 071) over Powder River (rancheria) is a prestressed concrete box beam or girders - multiple carrying Or 7 (hwy 071) over Powder River (rancheria) in Baker County, Oregon. It was built in 2010, so it is 15 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,340 vehicles a day, roughly 27% of them trucks, projected to reach 1,400 by 2042. The structure is 97 ft (29.6 m) long and 44 ft wide. If it were closed, the detour would be 37.3 mi (60 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Or 7 (hwy 071) over Powder River (rancheria) built?
It was built in 2010, making it 15 years old in 2025.
What condition is Or 7 (hwy 071) over Powder River (rancheria) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Or 7 (hwy 071) over Powder River (rancheria) carry?
About 1,340 vehicles per day (2022 count), of which roughly 27% are trucks.
How long is Or 7 (hwy 071) over Powder River (rancheria)?
The structure is 97 ft (29.6 m) long with a longest span of 96 ft (29.3 m) and a deck 44 ft wide.
Who owns Or 7 (hwy 071) over Powder River (rancheria)?
It is owned by the State Highway Agency.