US Bridges

I-84 (hwy 006) over Lime I/C and UPRR

Fair

Baker County, Oregon · 9.1 MI N Malheur CO Line · Structure no. 20482 006 34291

Built
2009
16 years old
Condition
Fair
inspected April 2023
Type
Box Beam or Girders - Multiple
Prestressed Concrete Continuous
Length
461 ft
3 main spans
Daily traffic
11,932
2022 count
Owner
State
State Highway Agency

About this bridge

I-84 (hwy 006) over Lime I/C and UPRR is a prestressed concrete continuous box beam or girders - multiple carrying I-84 (hwy 006) over Lime I/C and UPRR in Baker County, Oregon. It was built in 2009, so it is 16 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 11,932 vehicles a day, roughly 37% of them trucks, projected to reach 14,100 by 2042. The structure is 461 ft (140.5 m) long and 93 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesI-84 (hwy 006)
CrossesLime I/C and UPRR
Location9.1 MI N Malheur CO Line
RouteInterstate 84
StateOregon
Coordinates44.4119, -117.3083
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating37.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length461 ft (140.5 m)
Longest span175 ft (53.3 m)
Deck width93 ft (28.3 m)
Roadway width90 ft (27.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,932 (2022)
Projected traffic14,100 by 2042
Trucks37%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway and railroad
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-84 (hwy 006) over Lime I/C and UPRR built?

It was built in 2009, making it 16 years old in 2025.

What condition is I-84 (hwy 006) over Lime I/C and UPRR in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does I-84 (hwy 006) over Lime I/C and UPRR carry?

About 11,932 vehicles per day (2022 count), of which roughly 37% are trucks.

How long is I-84 (hwy 006) over Lime I/C and UPRR?

The structure is 461 ft (140.5 m) long with a longest span of 175 ft (53.3 m) and a deck 93 ft wide.

Who owns I-84 (hwy 006) over Lime I/C and UPRR?

It is owned by the State Highway Agency.