US Bridges

County RD 1146 over N Powder R (anthony L RD

Good

Baker County, Oregon · 127 MI NW JCT US HWY 30 · Structure no. 01798AB52101261

Built
1978
47 years old
Condition
Good
inspected June 2023
Type
Slab
Prestressed Concrete
Length
65 ft
1 main span
Daily traffic
648
2020 count
Owner
County
County Highway Agency

About this bridge

County RD 1146 over N Powder R (anthony L RD is a prestressed concrete slab carrying County RD 1146 over N Powder R (anthony L RD in Baker County, Oregon. It was built in 1978, so it is 47 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 648 vehicles a day, roughly 2% of them trucks, projected to reach 768 by 2025. The structure is 65 ft (19.8 m) long and 32 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesCounty RD 1146
CrossesN Powder R (anthony L RD
Location127 MI NW JCT US HWY 30
RouteCounty Highway B5210
StateOregon
Coordinates44.9941, -118.0814
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50.4 US tons
Inventory rating38.9 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadUnknown
Structure length65 ft (19.8 m)
Longest span65 ft (19.8 m)
Deck width32 ft (9.8 m)
Roadway width31 ft (9.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic648 (2020)
Projected traffic768 by 2025
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County RD 1146 over N Powder R (anthony L RD built?

It was built in 1978, making it 47 years old in 2025.

What condition is County RD 1146 over N Powder R (anthony L RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does County RD 1146 over N Powder R (anthony L RD carry?

About 648 vehicles per day (2020 count), of which roughly 2% are trucks.

How long is County RD 1146 over N Powder R (anthony L RD?

The structure is 65 ft (19.8 m) long with a longest span of 65 ft (19.8 m) and a deck 32 ft wide.

Who owns County RD 1146 over N Powder R (anthony L RD?

It is owned by the County Highway Agency.