US Bridges

E0300 over Sand Creek

Fair

Woodward County, Oklahoma · 3.5E 8.5N of Quinlan · Structure no. 228560000000000

Built
1991
34 years old
Condition
Fair
inspected May 2024
Type
Tee Beam
Prestressed Concrete
Length
165 ft
3 main spans
Daily traffic
60
2022 count
Owner
County
County Highway Agency

About this bridge

E0300 over Sand Creek is a prestressed concrete tee beam carrying E0300 over Sand Creek in Woodward County, Oklahoma. It was built in 1991, so it is 34 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 60 vehicles a day, roughly 15% of them trucks, projected to reach 96 by 2042. The structure is 165 ft (50.3 m) long and 28 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesE0300
CrossesSand Creek
Location3.5E 8.5N of Quinlan
RouteCounty Highway E0300
Coordinates36.57929, -98.98321
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.1 US tons
Inventory rating35.1 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length165 ft (50.3 m)
Longest span55 ft (16.8 m)
Deck width28 ft (8.6 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (2022)
Projected traffic96 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$644,000
NavigationNo navigation control on waterway

Frequently asked questions

When was E0300 over Sand Creek built?

It was built in 1991, making it 34 years old in 2025.

What condition is E0300 over Sand Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does E0300 over Sand Creek carry?

About 60 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is E0300 over Sand Creek?

The structure is 165 ft (50.3 m) long with a longest span of 55 ft (16.8 m) and a deck 28 ft wide.

Who owns E0300 over Sand Creek?

It is owned by the County Highway Agency.