US Bridges

E0215 (dorchester) over Creek

Good

Washington County, Oklahoma · .2E of Silver Lake · Structure no. 300230000000000

Built
2009
16 years old
Condition
Good
inspected January 2023
Type
Culvert
Concrete
Length
21 ft
2 main spans
Daily traffic
500
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

E0215 (dorchester) over Creek is a concrete culvert carrying E0215 (dorchester) over Creek in Washington County, Oklahoma. It was built in 2009, so it is 16 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 500 vehicles a day, roughly 5% of them trucks, projected to reach 800 by 2042. The structure is 21 ft (6.4 m) long and 39 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesE0215 (dorchester)
CrossesCreek
Location.2E of Silver Lake
RouteCity Street E0215
Coordinates36.70583, -95.94972
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating36 US tons
Inventory rating21.6 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadH 20
Structure length21 ft (6.4 m)
Longest span10 ft (3 m)
Deck width39 ft (11.9 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2022)
Projected traffic800 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$225,000
NavigationNo navigation control on waterway

Frequently asked questions

When was E0215 (dorchester) over Creek built?

It was built in 2009, making it 16 years old in 2025.

What condition is E0215 (dorchester) over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2023.

How much traffic does E0215 (dorchester) over Creek carry?

About 500 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is E0215 (dorchester) over Creek?

The structure is 21 ft (6.4 m) long with a longest span of 10 ft (3 m) and a deck 39 ft wide.

Who owns E0215 (dorchester) over Creek?

It is owned by the City or Municipal Highway Agency.