US Bridges

S274th E St. over Creek

GoodPosted for load

Wagoner County, Oklahoma · 0.1E SH51; 0.1N 121st St. · Structure no. 188480000000000

Built
1975
50 years old
Condition
Good
inspected October 2024
Type
Culvert
Concrete
Length
27 ft
3 main spans
Daily traffic
200
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

S274th E St. over Creek is a concrete culvert carrying S274th E St. over Creek in Wagoner County, Oklahoma. It was built in 1975, so it is 50 years old, older than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.

It carries about 200 vehicles a day, roughly 10% of them trucks, projected to reach 320 by 2042. The structure is 27 ft (8.1 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesS274th E St.
CrossesCreek
Location0.1E SH51; 0.1N 121st St.
RouteCounty Highway E0709
Coordinates35.98964, -95.67093
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating32.6 US tons
Inventory rating19.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length27 ft (8.1 m)
Longest span8 ft (2.4 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2022)
Projected traffic320 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$225,000
NavigationNo navigation control on waterway

Frequently asked questions

When was S274th E St. over Creek built?

It was built in 1975, making it 50 years old in 2025.

What condition is S274th E St. over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does S274th E St. over Creek carry?

About 200 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is S274th E St. over Creek?

The structure is 27 ft (8.1 m) long with a longest span of 8 ft (2.4 m) and a deck 26 ft wide.

Who owns S274th E St. over Creek?

It is owned by the City or Municipal Highway Agency.