US Bridges

S Mingo RD over Haikey Creek West Branch

Good

Tulsa County, Oklahoma · 7600 S Mingo Road · Structure no. 333210000000000

Built
2022
3 years old
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
21 ft
2 main spans
Daily traffic
181,800
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

S Mingo RD over Haikey Creek West Branch is a concrete culvert carrying S Mingo RD over Haikey Creek West Branch in Tulsa County, Oklahoma. It was built in 2022, so it is 3 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 181,800 vehicles a day, roughly 16% of them trucks, projected to reach 28,960 by 2043. The structure is 21 ft (6.4 m) long and 100 ft wide.

CarriesS Mingo RD
CrossesHaikey Creek West Branch
Location7600 S Mingo Road
RouteCounty Highway N4010
Coordinates36.15274, -95.86854
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating47 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length21 ft (6.4 m)
Longest span10 ft (3 m)
Deck width100 ft (30.5 m)
Roadway width65 ft (19.8 m)
Vertical clearance over deck0 ft (0 m)

Traffic and service

Average daily traffic181,800 (2020)
Projected traffic28,960 by 2043
Trucks16%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S Mingo RD over Haikey Creek West Branch built?

It was built in 2022, making it 3 years old in 2025.

What condition is S Mingo RD over Haikey Creek West Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does S Mingo RD over Haikey Creek West Branch carry?

About 181,800 vehicles per day (2020 count), of which roughly 16% are trucks.

How long is S Mingo RD over Haikey Creek West Branch?

The structure is 21 ft (6.4 m) long with a longest span of 10 ft (3 m) and a deck 100 ft wide.

Who owns S Mingo RD over Haikey Creek West Branch?

It is owned by the City or Municipal Highway Agency.