US Bridges

Poplar over Haikey Creek Tributary

Good

Tulsa County, Oklahoma · 2.5 E of Aspen Ave · Structure no. 328510000000000

Built
2019
6 years old
Condition
Good
inspected February 2023
Type
Culvert
Concrete
Length
23 ft
2 main spans
Daily traffic
100
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Poplar over Haikey Creek Tributary is a concrete culvert carrying Poplar over Haikey Creek Tributary in Tulsa County, Oklahoma. It was built in 2019, so it is 6 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 5% of them trucks, projected to reach 160 by 2042. The structure is 23 ft (7 m) long and 57 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesPoplar
CrossesHaikey Creek Tributary
Location2.5 E of Aspen Ave
RouteCity Street N4042
Coordinates36.04019, -95.81081
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59 US tons
Inventory rating35.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length23 ft (7 m)
Longest span10 ft (3 m)
Deck width57 ft (17.4 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2022)
Projected traffic160 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Poplar over Haikey Creek Tributary built?

It was built in 2019, making it 6 years old in 2025.

What condition is Poplar over Haikey Creek Tributary in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.

How much traffic does Poplar over Haikey Creek Tributary carry?

About 100 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Poplar over Haikey Creek Tributary?

The structure is 23 ft (7 m) long with a longest span of 10 ft (3 m) and a deck 57 ft wide.

Who owns Poplar over Haikey Creek Tributary?

It is owned by the City or Municipal Highway Agency.