US Bridges

FAU8301 (peoria) over Crow Creek

Good

Tulsa County, Oklahoma · 3200 S Peoria · Structure no. 326000000000000

Built
2022
3 years old
Condition
Good
inspected August 2024
Type
Culvert
Concrete
Length
54 ft
3 main spans
Daily traffic
19,127
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

FAU8301 (peoria) over Crow Creek is a concrete culvert carrying FAU8301 (peoria) over Crow Creek in Tulsa County, Oklahoma. It was built in 2022, so it is 3 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 19,127 vehicles a day, roughly 5% of them trucks, projected to reach 30,603 by 2042. The structure is 54 ft (16.5 m) long and 63 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFAU8301 (peoria)
CrossesCrow Creek
Location3200 S Peoria
RouteCity Street 8301
Coordinates36.11625, -95.97576
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length54 ft (16.5 m)
Longest span17 ft (5.1 m)
Deck width63 ft (19.2 m)
Roadway width46 ft (14 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic19,127 (2022)
Projected traffic30,603 by 2042
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FAU8301 (peoria) over Crow Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is FAU8301 (peoria) over Crow Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does FAU8301 (peoria) over Crow Creek carry?

About 19,127 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is FAU8301 (peoria) over Crow Creek?

The structure is 54 ft (16.5 m) long with a longest span of 17 ft (5.1 m) and a deck 63 ft wide.

Who owns FAU8301 (peoria) over Crow Creek?

It is owned by the City or Municipal Highway Agency.