US Bridges

U.S. 64 over Snake Creek

Good

Tulsa County, Oklahoma · 10.4 S of Creek T.P. · Structure no. 314230000000000

Built
2019
6 years old
Condition
Good
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
260 ft
3 main spans
Daily traffic
5,415
2022 count
Owner
State
State Highway Agency

About this bridge

U.S. 64 over Snake Creek is a prestressed concrete stringer/multi-beam or girder carrying U.S. 64 over Snake Creek in Tulsa County, Oklahoma. It was built in 2019, so it is 6 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,415 vehicles a day, roughly 8% of them trucks, projected to reach 7,515 by 2042. The structure is 260 ft (79.4 m) long and 42 ft wide. If it were closed, the detour would be 36 mi (58 km).

CarriesU.S. 64
CrossesSnake Creek
Location10.4 S of Creek T.P.
RouteU.S. Route 64
Coordinates35.91472, -95.83333
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating56.5 US tons
Inventory rating37.8 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length260 ft (79.4 m)
Longest span100 ft (30.5 m)
Deck width42 ft (12.8 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,415 (2022)
Projected traffic7,515 by 2042
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed36 mi (58 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was U.S. 64 over Snake Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is U.S. 64 over Snake Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does U.S. 64 over Snake Creek carry?

About 5,415 vehicles per day (2022 count), of which roughly 8% are trucks.

How long is U.S. 64 over Snake Creek?

The structure is 260 ft (79.4 m) long with a longest span of 100 ft (30.5 m) and a deck 42 ft wide.

Who owns U.S. 64 over Snake Creek?

It is owned by the State Highway Agency.