US Bridges

E0598 over Parkview Ditch

Good

Tulsa County, Oklahoma · 1500 W Charles Page Blvd · Structure no. 295180000000000

Built
2009
16 years old
Condition
Good
inspected March 2023
Type
Tee Beam
Prestressed Concrete
Length
51 ft
1 main span
Daily traffic
100
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

E0598 over Parkview Ditch is a prestressed concrete tee beam carrying E0598 over Parkview Ditch in Tulsa County, Oklahoma. It was built in 2009, so it is 16 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, roughly 5% of them trucks, projected to reach 160 by 2042. The structure is 51 ft (15.4 m) long and 35 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesE0598
CrossesParkview Ditch
Location1500 W Charles Page Blvd
RouteCity Street E0598
Coordinates36.15056, -96.01083
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47 US tons
Inventory rating36 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length51 ft (15.4 m)
Longest span48 ft (14.5 m)
Deck width35 ft (10.7 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2022)
Projected traffic160 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$369,000
NavigationNo navigation control on waterway

Frequently asked questions

When was E0598 over Parkview Ditch built?

It was built in 2009, making it 16 years old in 2025.

What condition is E0598 over Parkview Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does E0598 over Parkview Ditch carry?

About 100 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is E0598 over Parkview Ditch?

The structure is 51 ft (15.4 m) long with a longest span of 48 ft (14.5 m) and a deck 35 ft wide.

Who owns E0598 over Parkview Ditch?

It is owned by the City or Municipal Highway Agency.