US Bridges

I-44 N. Frtg. Rd. over Perryman Ditch

Fair

Tulsa County, Oklahoma · 1.2E of Ark.Riv. N.Frt RD · Structure no. 287110000000000

Built
2009
16 years old
Condition
Fair
inspected August 2024
Type
Culvert
Concrete
Length
6,336 ft
3 main spans
Daily traffic
84,700
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

I-44 N. Frtg. Rd. over Perryman Ditch is a concrete culvert carrying I-44 N. Frtg. Rd. over Perryman Ditch in Tulsa County, Oklahoma. It was built in 2009, so it is 16 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 84,700 vehicles a day, roughly 12% of them trucks, projected to reach 135,520 by 2042. The structure is 6,336 ft (1,931.2 m) long and 36 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesI-44 N. Frtg. Rd.
CrossesPerryman Ditch
Location1.2E of Ark.Riv. N.Frt RD
RouteCity Street E0594
Coordinates36.09083, -95.985
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating47 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length6,336 ft (1,931.2 m)
Longest span12 ft (3.7 m)
Deck width36 ft (11 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic84,700 (2022)
Projected traffic135,520 by 2042
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$644,000
NavigationNo navigation control on waterway

Frequently asked questions

When was I-44 N. Frtg. Rd. over Perryman Ditch built?

It was built in 2009, making it 16 years old in 2025.

What condition is I-44 N. Frtg. Rd. over Perryman Ditch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does I-44 N. Frtg. Rd. over Perryman Ditch carry?

About 84,700 vehicles per day (2022 count), of which roughly 12% are trucks.

How long is I-44 N. Frtg. Rd. over Perryman Ditch?

The structure is 6,336 ft (1,931.2 m) long with a longest span of 12 ft (3.7 m) and a deck 36 ft wide.

Who owns I-44 N. Frtg. Rd. over Perryman Ditch?

It is owned by the City or Municipal Highway Agency.