US Bridges

7282C(PEORIA Ave.) over Posey Creek

Fair

Tulsa County, Oklahoma · .8S of 141st St. South · Structure no. 281270000000000

Built
2004
21 years old
Condition
Fair
inspected November 2023
Type
Culvert
Concrete
Length
28 ft
2 main spans
Daily traffic
3,930
2024 count
Owner
County
County Highway Agency

About this bridge

7282C(PEORIA Ave.) over Posey Creek is a concrete culvert carrying 7282C(PEORIA Ave.) over Posey Creek in Tulsa County, Oklahoma. It was built in 2004, so it is 21 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,930 vehicles a day, roughly 10% of them trucks, projected to reach 6,287 by 2044. The structure is 28 ft (8.4 m) long and 63 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries7282C(PEORIA Ave.)
CrossesPosey Creek
Location.8S of 141st St. South
RouteCounty Highway 7282C
Coordinates35.94864, -95.97603
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length28 ft (8.4 m)
Longest span13 ft (3.9 m)
Deck width63 ft (19.2 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,930 (2024)
Projected traffic6,287 by 2044
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.2 million
NavigationNo navigation control on waterway

Frequently asked questions

When was 7282C(PEORIA Ave.) over Posey Creek built?

It was built in 2004, making it 21 years old in 2025.

What condition is 7282C(PEORIA Ave.) over Posey Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does 7282C(PEORIA Ave.) over Posey Creek carry?

About 3,930 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is 7282C(PEORIA Ave.) over Posey Creek?

The structure is 28 ft (8.4 m) long with a longest span of 13 ft (3.9 m) and a deck 63 ft wide.

Who owns 7282C(PEORIA Ave.) over Posey Creek?

It is owned by the County Highway Agency.