U.S. 64 EB US75NB over US64/SH51WB/13st/DETROIT
FairTulsa County, Oklahoma · JCT I-444 & SH-51 · Structure no. 200020000000000
- Built
- 1981
- 44 years old
- Condition
- Fair
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 580 ft
- 8 main spans
- Daily traffic
- 22,850
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
U.S. 64 EB US75NB over US64/SH51WB/13st/DETROIT is a concrete continuous box beam or girders - multiple carrying U.S. 64 EB US75NB over US64/SH51WB/13st/DETROIT in Tulsa County, Oklahoma. It was built in 1981, so it is 44 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 22,850 vehicles a day, roughly 12% of them trucks, projected to reach 36,560 by 2042. The structure is 580 ft (176.8 m) long and 31 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was U.S. 64 EB US75NB over US64/SH51WB/13st/DETROIT built?
It was built in 1981, making it 44 years old in 2025.
What condition is U.S. 64 EB US75NB over US64/SH51WB/13st/DETROIT in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does U.S. 64 EB US75NB over US64/SH51WB/13st/DETROIT carry?
About 22,850 vehicles per day (2022 count), of which roughly 12% are trucks.
How long is U.S. 64 EB US75NB over US64/SH51WB/13st/DETROIT?
The structure is 580 ft (176.8 m) long with a longest span of 90 ft (27.4 m) and a deck 31 ft wide.
Who owns U.S. 64 EB US75NB over US64/SH51WB/13st/DETROIT?
It is owned by the State Highway Agency.