US Bridges

E0607 (wekiwa Rd.) over Creek

Fair

Tulsa County, Oklahoma · 0.5 MI E of 129 W Ave · Structure no. 147460000000000

Built
1960
65 years old, rebuilt 2010
Condition
Fair
inspected September 2023
Type
Culvert
Concrete
Length
32 ft
3 main spans
Daily traffic
100
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

E0607 (wekiwa Rd.) over Creek is a concrete culvert carrying E0607 (wekiwa Rd.) over Creek in Tulsa County, Oklahoma. It was built in 1960 and reconstructed in 2010, so it is 65 years old, older than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 160 by 2042. The structure is 32 ft (9.8 m) long and 61 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesE0607 (wekiwa Rd.)
CrossesCreek
Location0.5 MI E of 129 W Ave
RouteCity Street E0607
Coordinates36.13918, -96.12563
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating43.8 US tons
Inventory rating26.2 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span10 ft (3 m)
Deck width61 ft (18.7 m)
Roadway width41 ft (12.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2022)
Projected traffic160 by 2042
Trucks10%
Lanes on structure3
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$225,000
NavigationNo navigation control on waterway

Frequently asked questions

When was E0607 (wekiwa Rd.) over Creek built?

It was built in 1960, making it 65 years old in 2025. It was reconstructed in 2010.

What condition is E0607 (wekiwa Rd.) over Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does E0607 (wekiwa Rd.) over Creek carry?

About 100 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is E0607 (wekiwa Rd.) over Creek?

The structure is 32 ft (9.8 m) long with a longest span of 10 ft (3 m) and a deck 61 ft wide.

Who owns E0607 (wekiwa Rd.) over Creek?

It is owned by the City or Municipal Highway Agency.