FAU 8400 (apache) over Quarry Creek
FairTulsa County, Oklahoma · 12100 E. Apache St. · Structure no. 015760000000000
- Built
- 1925
- 100 years old
- Condition
- Fair
- inspected November 2024
- Type
- Slab
- Concrete
- Length
- 55 ft
- 3 main spans
- Daily traffic
- 800
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FAU 8400 (apache) over Quarry Creek is a concrete slab carrying FAU 8400 (apache) over Quarry Creek in Tulsa County, Oklahoma. It was built in 1925, so it is 100 years old, older than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 800 vehicles a day, roughly 5% of them trucks, projected to reach 1,280 by 2042. The structure is 55 ft (16.9 m) long and 27 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 8400 (apache) over Quarry Creek built?
It was built in 1925, making it 100 years old in 2025.
What condition is FAU 8400 (apache) over Quarry Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does FAU 8400 (apache) over Quarry Creek carry?
About 800 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is FAU 8400 (apache) over Quarry Creek?
The structure is 55 ft (16.9 m) long with a longest span of 18 ft (5.6 m) and a deck 27 ft wide.
Who owns FAU 8400 (apache) over Quarry Creek?
It is owned by the City or Municipal Highway Agency.