US Bridges

S.H. 53 over Pine Creek

Good

Stephens County, Oklahoma · 8.6 W S.H. 89 · Structure no. 317470000000000

Built
2021
4 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
150 ft
3 main spans
Daily traffic
553
2022 count
Owner
State
State Highway Agency

About this bridge

S.H. 53 over Pine Creek is a prestressed concrete stringer/multi-beam or girder carrying S.H. 53 over Pine Creek in Stephens County, Oklahoma. It was built in 2021, so it is 4 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 553 vehicles a day, roughly 15% of them trucks, projected to reach 774 by 2042. The structure is 150 ft (45.7 m) long and 42 ft wide. If it were closed, the detour would be 24.2 mi (39 km).

CarriesS.H. 53
CrossesPine Creek
Location8.6 W S.H. 89
RouteState Highway 53
Coordinates34.34722, -97.72639
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.8 US tons
Inventory rating37.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length150 ft (45.7 m)
Longest span50 ft (15.2 m)
Deck width42 ft (12.9 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic553 (2022)
Projected traffic774 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed24.2 mi (39 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S.H. 53 over Pine Creek built?

It was built in 2021, making it 4 years old in 2025.

What condition is S.H. 53 over Pine Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does S.H. 53 over Pine Creek carry?

About 553 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is S.H. 53 over Pine Creek?

The structure is 150 ft (45.7 m) long with a longest span of 50 ft (15.2 m) and a deck 42 ft wide.

Who owns S.H. 53 over Pine Creek?

It is owned by the State Highway Agency.