Wilson Rock Rd. over I-40 under
FairPosted for loadSequoyah County, Oklahoma · 3.4 W JCT US-64 · Structure no. 161200000000000
- Built
- 1964
- 61 years old
- Condition
- Fair
- inspected October 2023
- Type
- Slab
- Concrete Continuous
- Length
- 181 ft
- 4 main spans
- Daily traffic
- 925
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Wilson Rock Rd. over I-40 under is a concrete continuous slab carrying Wilson Rock Rd. over I-40 under in Sequoyah County, Oklahoma. It was built in 1964, so it is 61 years old, older than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 925 vehicles a day, roughly 11% of them trucks, projected to reach 1,480 by 2042. The structure is 181 ft (55.2 m) long and 29 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Wilson Rock Rd. over I-40 under built?
It was built in 1964, making it 61 years old in 2025.
What condition is Wilson Rock Rd. over I-40 under in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Wilson Rock Rd. over I-40 under carry?
About 925 vehicles per day (2022 count), of which roughly 11% are trucks.
How long is Wilson Rock Rd. over I-40 under?
The structure is 181 ft (55.2 m) long with a longest span of 56 ft (17.1 m) and a deck 29 ft wide.
Who owns Wilson Rock Rd. over I-40 under?
It is owned by the State Highway Agency.