US Bridges

S.H. 82 / S.H. 100 over Snake Creek

Fair

Sequoyah County, Oklahoma · 11.19 N JCT US-64 · Structure no. 128230000000000

Built
1952
73 years old
Condition
Fair
inspected October 2023
Type
Slab
Concrete
Length
128 ft
4 main spans
Daily traffic
1,700
2022 count
Owner
State
State Highway Agency

About this bridge

S.H. 82 / S.H. 100 over Snake Creek is a concrete slab carrying S.H. 82 / S.H. 100 over Snake Creek in Sequoyah County, Oklahoma. It was built in 1952, so it is 73 years old, older than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,700 vehicles a day, roughly 15% of them trucks, projected to reach 2,720 by 2042. The structure is 128 ft (39 m) long and 27 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesS.H. 82 / S.H. 100
CrossesSnake Creek
Location11.19 N JCT US-64
RouteState Highway 82
Coordinates35.63761, -94.96078
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating45.7 US tons
Inventory rating27.4 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadH 15
Structure length128 ft (39 m)
Longest span35 ft (10.7 m)
Deck width27 ft (8.2 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,700 (2022)
Projected traffic2,720 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.7 million
NavigationNo navigation control on waterway

Frequently asked questions

When was S.H. 82 / S.H. 100 over Snake Creek built?

It was built in 1952, making it 73 years old in 2025.

What condition is S.H. 82 / S.H. 100 over Snake Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does S.H. 82 / S.H. 100 over Snake Creek carry?

About 1,700 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is S.H. 82 / S.H. 100 over Snake Creek?

The structure is 128 ft (39 m) long with a longest span of 35 ft (10.7 m) and a deck 27 ft wide.

Who owns S.H. 82 / S.H. 100 over Snake Creek?

It is owned by the State Highway Agency.