US Bridges

IRR N3650 FAU 1241 over Creek

Good

Seminole County, Oklahoma · 1.1S 1W of Wewoka · Structure no. 323680000000000

Built
2020
5 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
75 ft
1 main span
Daily traffic
200
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

IRR N3650 FAU 1241 over Creek is a prestressed concrete stringer/multi-beam or girder carrying IRR N3650 FAU 1241 over Creek in Seminole County, Oklahoma. It was built in 2020, so it is 5 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 5% of them trucks, projected to reach 320 by 2042. The structure is 75 ft (22.9 m) long and 29 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesIRR N3650 FAU 1241
CrossesCreek
Location1.1S 1W of Wewoka
RouteCity Street N3650
Coordinates35.14463, -96.51158
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating68 US tons
Inventory rating41 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length75 ft (22.9 m)
Longest span70 ft (21.3 m)
Deck width29 ft (8.7 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic200 (2022)
Projected traffic320 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR N3650 FAU 1241 over Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is IRR N3650 FAU 1241 over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does IRR N3650 FAU 1241 over Creek carry?

About 200 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is IRR N3650 FAU 1241 over Creek?

The structure is 75 ft (22.9 m) long with a longest span of 70 ft (21.3 m) and a deck 29 ft wide.

Who owns IRR N3650 FAU 1241 over Creek?

It is owned by the City or Municipal Highway Agency and maintained by the County Highway Agency.