US Bridges

U.S. 270 over Creek

Fair

Seminole County, Oklahoma · 8.6 MI SE SH 3 · Structure no. 137570000000000

Built
1957
68 years old
Condition
Fair
inspected January 2024
Type
Culvert
Concrete
Length
34 ft
3 main spans
Daily traffic
6,100
2022 count
Owner
State
State Highway Agency

About this bridge

U.S. 270 over Creek is a concrete culvert carrying U.S. 270 over Creek in Seminole County, Oklahoma. It was built in 1957, so it is 68 years old, older than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,100 vehicles a day, roughly 16% of them trucks, projected to reach 9,760 by 2042. The structure is 34 ft (10.4 m) long and 42 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesU.S. 270
CrossesCreek
Location8.6 MI SE SH 3
RouteU.S. Route 270
Coordinates35.15934, -96.5515
Functional classRural Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating62.5 US tons
Inventory rating37.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length34 ft (10.4 m)
Longest span10 ft (3 m)
Deck width42 ft (12.8 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,100 (2022)
Projected traffic9,760 by 2042
Trucks16%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$644,000
NavigationNo navigation control on waterway

Frequently asked questions

When was U.S. 270 over Creek built?

It was built in 1957, making it 68 years old in 2025.

What condition is U.S. 270 over Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does U.S. 270 over Creek carry?

About 6,100 vehicles per day (2022 count), of which roughly 16% are trucks.

How long is U.S. 270 over Creek?

The structure is 34 ft (10.4 m) long with a longest span of 10 ft (3 m) and a deck 42 ft wide.

Who owns U.S. 270 over Creek?

It is owned by the State Highway Agency.