US Bridges

E0410 over Dog Creek

Good

Rogers County, Oklahoma · .5S of Foyil 1.5E HWY 66 · Structure no. 308610000000000

Built
2017
8 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
116 ft
1 main span
Daily traffic
350
2022 count
Owner
County
County Highway Agency

About this bridge

E0410 over Dog Creek is a prestressed concrete stringer/multi-beam or girder carrying E0410 over Dog Creek in Rogers County, Oklahoma. It was built in 2017, so it is 8 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 350 vehicles a day, roughly 10% of them trucks, projected to reach 560 by 2042. The structure is 116 ft (35.5 m) long and 35 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesE0410
CrossesDog Creek
Location.5S of Foyil 1.5E HWY 66
RouteCounty Highway E0410
Coordinates36.42327, -95.50876
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating106 US tons
Inventory rating64 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length116 ft (35.5 m)
Longest span115 ft (35.1 m)
Deck width35 ft (10.7 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic350 (2022)
Projected traffic560 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was E0410 over Dog Creek built?

It was built in 2017, making it 8 years old in 2025.

What condition is E0410 over Dog Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does E0410 over Dog Creek carry?

About 350 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is E0410 over Dog Creek?

The structure is 116 ft (35.5 m) long with a longest span of 115 ft (35.1 m) and a deck 35 ft wide.

Who owns E0410 over Dog Creek?

It is owned by the County Highway Agency.