US Bridges

N3540 (euchee) over Turkey Creek

Good

Payne County, Oklahoma · EUCHEEVALLEY/80THST.1S · Structure no. 298560000000000

Built
2008
17 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
108 ft
1 main span
Daily traffic
200
2022 count
Owner
County
County Highway Agency

About this bridge

N3540 (euchee) over Turkey Creek is a prestressed concrete stringer/multi-beam or girder carrying N3540 (euchee) over Turkey Creek in Payne County, Oklahoma. It was built in 2008, so it is 17 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 10% of them trucks, projected to reach 320 by 2042. The structure is 108 ft (32.9 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesN3540 (euchee)
CrossesTurkey Creek
LocationEUCHEEVALLEY/80THST.1S
RouteCounty Highway N3540
Coordinates36.02694, -96.69667
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating91.1 US tons
Inventory rating41 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length108 ft (32.9 m)
Longest span104 ft (31.7 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2022)
Projected traffic320 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was N3540 (euchee) over Turkey Creek built?

It was built in 2008, making it 17 years old in 2025.

What condition is N3540 (euchee) over Turkey Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does N3540 (euchee) over Turkey Creek carry?

About 200 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is N3540 (euchee) over Turkey Creek?

The structure is 108 ft (32.9 m) long with a longest span of 104 ft (31.7 m) and a deck 28 ft wide.

Who owns N3540 (euchee) over Turkey Creek?

It is owned by the County Highway Agency.