US Bridges

9th St. over Euchee CREEK(W0720)

Good

Payne County, Oklahoma · 9th St\euchee VY.3E · Structure no. 251540000000000

Built
1999
26 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Concrete
Length
173 ft
3 main spans
Daily traffic
200
2022 count
Owner
County
County Highway Agency

About this bridge

9th St. over Euchee CREEK(W0720) is a concrete stringer/multi-beam or girder carrying 9th St. over Euchee CREEK(W0720) in Payne County, Oklahoma. It was built in 1999, so it is 26 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 10% of them trucks, projected to reach 320 by 2042. The structure is 173 ft (52.7 m) long and 29 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries9th St.
CrossesEuchee CREEK(W0720)
Location9th St\euchee VY.3E
RouteCounty Highway E0720
Coordinates35.97118, -96.69026
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.1 US tons
Inventory rating37 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length173 ft (52.7 m)
Longest span70 ft (21.3 m)
Deck width29 ft (8.7 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2022)
Projected traffic320 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$5.7 million
NavigationNo navigation control on waterway

Frequently asked questions

When was 9th St. over Euchee CREEK(W0720) built?

It was built in 1999, making it 26 years old in 2025.

What condition is 9th St. over Euchee CREEK(W0720) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does 9th St. over Euchee CREEK(W0720) carry?

About 200 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is 9th St. over Euchee CREEK(W0720)?

The structure is 173 ft (52.7 m) long with a longest span of 70 ft (21.3 m) and a deck 29 ft wide.

Who owns 9th St. over Euchee CREEK(W0720)?

It is owned by the County Highway Agency.