US Bridges

Tisdale Pkwy. N-Bd over Apache St. under

Fair

Osage County, Oklahoma · 2600 N. Tisdale Pkwy · Structure no. 265760000000000

Built
2001
24 years old
Condition
Fair
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
218 ft
2 main spans
Daily traffic
12,000
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Tisdale Pkwy. N-Bd over Apache St. under is a prestressed concrete stringer/multi-beam or girder carrying Tisdale Pkwy. N-Bd over Apache St. under in Osage County, Oklahoma. It was built in 2001, so it is 24 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 12,000 vehicles a day, roughly 16% of them trucks, projected to reach 19,200 by 2042. The structure is 218 ft (66.4 m) long and 40 ft wide.

CarriesTisdale Pkwy. N-Bd
CrossesApache St. under
Location2600 N. Tisdale Pkwy
RouteCity Street 0
Coordinates36.19216, -96.00375
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating77.1 US tons
Inventory rating46 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length218 ft (66.4 m)
Longest span120 ft (36.6 m)
Deck width40 ft (12.3 m)
Roadway width40 ft (12.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,000 (2022)
Projected traffic19,200 by 2042
Trucks16%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$2.8 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Tisdale Pkwy. N-Bd over Apache St. under built?

It was built in 2001, making it 24 years old in 2025.

What condition is Tisdale Pkwy. N-Bd over Apache St. under in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does Tisdale Pkwy. N-Bd over Apache St. under carry?

About 12,000 vehicles per day (2022 count), of which roughly 16% are trucks.

How long is Tisdale Pkwy. N-Bd over Apache St. under?

The structure is 218 ft (66.4 m) long with a longest span of 120 ft (36.6 m) and a deck 40 ft wide.

Who owns Tisdale Pkwy. N-Bd over Apache St. under?

It is owned by the City or Municipal Highway Agency.