US Bridges

FAU 1944 (div. St) over Creek

Fair

Okmulgee County, Oklahoma · 1.7 MI W of SH 75 · Structure no. 188350000000000

Built
1975
50 years old
Condition
Fair
inspected August 2023
Type
Culvert
Concrete
Length
26 ft
3 main spans
Daily traffic
200
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

FAU 1944 (div. St) over Creek is a concrete culvert carrying FAU 1944 (div. St) over Creek in Okmulgee County, Oklahoma. It was built in 1975, so it is 50 years old, older than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 200 vehicles a day, roughly 5% of them trucks, projected to reach 320 by 2042. The structure is 26 ft (7.9 m) long and 35 ft wide.

CarriesFAU 1944 (div. St)
CrossesCreek
Location1.7 MI W of SH 75
RouteCity Street 1944
Coordinates35.44196, -96.00005
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating47.3 US tons
Inventory rating28.3 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span8 ft (2.4 m)
Deck width35 ft (10.7 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2022)
Projected traffic320 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$225,000
NavigationNo navigation control on waterway

Frequently asked questions

When was FAU 1944 (div. St) over Creek built?

It was built in 1975, making it 50 years old in 2025.

What condition is FAU 1944 (div. St) over Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does FAU 1944 (div. St) over Creek carry?

About 200 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is FAU 1944 (div. St) over Creek?

The structure is 26 ft (7.9 m) long with a longest span of 8 ft (2.4 m) and a deck 35 ft wide.

Who owns FAU 1944 (div. St) over Creek?

It is owned by the City or Municipal Highway Agency.