US Bridges

Maintenance Depot over Railyard Road

Good

Oklahoma County, Oklahoma · 0.20 Miles East of S. Air · Structure no. AFOKWWYK05722

Built
2018
7 years old
Condition
Good
inspected November 2024
Type
Arch - Deck
Concrete
Length
36 ft
1 main span
Daily traffic
50
2022 count
Owner
Federal
Air Force

About this bridge

Maintenance Depot over Railyard Road is a concrete arch - deck carrying Maintenance Depot over Railyard Road in Oklahoma County, Oklahoma. It was built in 2018, so it is 7 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 55 by 2032. The structure is 36 ft (11 m) long and 36 ft wide.

CarriesMaintenance Depot
CrossesRailyard Road
Location0.20 Miles East of S. Air
RouteFederal Lands Road 0
Coordinates35.40047, -97.40364
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75 US tons
Inventory rating45 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckNot applicable
Main spans1
Design loadUnknown
Structure length36 ft (11 m)
Longest span36 ft (11 m)
Deck width36 ft (11 m)
Roadway width34 ft (10.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2022)
Projected traffic55 by 2032
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerAir Force
Maintained byAir Force
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$3,000 (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Maintenance Depot over Railyard Road built?

It was built in 2018, making it 7 years old in 2025.

What condition is Maintenance Depot over Railyard Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does Maintenance Depot over Railyard Road carry?

About 50 vehicles per day (2022 count).

How long is Maintenance Depot over Railyard Road?

The structure is 36 ft (11 m) long with a longest span of 36 ft (11 m) and a deck 36 ft wide.

Who owns Maintenance Depot over Railyard Road?

It is owned by the Air Force.