US Bridges

Kickapoo Tp NB over NE 164th ST under

Good

Oklahoma County, Oklahoma · .20E of N Luther &NE164th · Structure no. 324170000000000

Built
2020
5 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
221 ft
3 main spans
Daily traffic
30,400
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

Kickapoo Tp NB over NE 164th ST under is a prestressed concrete stringer/multi-beam or girder carrying Kickapoo Tp NB over NE 164th ST under in Oklahoma County, Oklahoma. It was built in 2020, so it is 5 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30,400 vehicles a day, roughly 12% of them trucks, projected to reach 48,640 by 2042. The structure is 221 ft (67.4 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesKickapoo Tp NB
CrossesNE 164th ST under
Location.20E of N Luther &NE164th
RouteInterstate 335
Coordinates35.6374, -97.19125
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.5 US tons
Inventory rating28.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length221 ft (67.4 m)
Longest span90 ft (27.4 m)
Deck width41 ft (12.5 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30,400 (2022)
Projected traffic48,640 by 2042
Trucks12%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Kickapoo Tp NB over NE 164th ST under built?

It was built in 2020, making it 5 years old in 2025.

What condition is Kickapoo Tp NB over NE 164th ST under in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Kickapoo Tp NB over NE 164th ST under carry?

About 30,400 vehicles per day (2022 count), of which roughly 12% are trucks.

How long is Kickapoo Tp NB over NE 164th ST under?

The structure is 221 ft (67.4 m) long with a longest span of 90 ft (27.4 m) and a deck 41 ft wide.

Who owns Kickapoo Tp NB over NE 164th ST under?

It is owned by the State Toll Authority.