US Bridges

E0960 (nw 150th) over Creek

Good

Oklahoma County, Oklahoma · 75W NW 150th & Western · Structure no. 268990000000000

Built
2005
20 years old
Condition
Good
inspected August 2023
Type
Culvert
Concrete
Length
53 ft
4 main spans
Daily traffic
5,550
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

E0960 (nw 150th) over Creek is a concrete culvert carrying E0960 (nw 150th) over Creek in Oklahoma County, Oklahoma. It was built in 2005, so it is 20 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,550 vehicles a day, roughly 5% of them trucks, projected to reach 8,880 by 2042. The structure is 53 ft (16.2 m) long and 105 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesE0960 (nw 150th)
CrossesCreek
Location75W NW 150th & Western
RouteCity Street E0960
Coordinates35.62333, -97.53139
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection4 PoorAdvanced section loss, deterioration, spalling or scour.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating101.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHS 20
Structure length53 ft (16.2 m)
Longest span12 ft (3.7 m)
Deck width105 ft (31.9 m)
Roadway width65 ft (19.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,550 (2022)
Projected traffic8,880 by 2042
Trucks5%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.2 million
NavigationNo navigation control on waterway

Frequently asked questions

When was E0960 (nw 150th) over Creek built?

It was built in 2005, making it 20 years old in 2025.

What condition is E0960 (nw 150th) over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does E0960 (nw 150th) over Creek carry?

About 5,550 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is E0960 (nw 150th) over Creek?

The structure is 53 ft (16.2 m) long with a longest span of 12 ft (3.7 m) and a deck 105 ft wide.

Who owns E0960 (nw 150th) over Creek?

It is owned by the City or Municipal Highway Agency.