US Bridges

N3075 N Walker Ave over Creek

Good

Oklahoma County, Oklahoma · .2N of NW 36 on Walker · Structure no. 267130000000000

Built
1995
30 years old
Condition
Good
inspected August 2023
Type
Culvert
Concrete
Length
39 ft
3 main spans
Daily traffic
250
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

N3075 N Walker Ave over Creek is a concrete culvert carrying N3075 N Walker Ave over Creek in Oklahoma County, Oklahoma. It was built in 1995, so it is 30 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 250 vehicles a day, roughly 15% of them trucks, projected to reach 400 by 2042. The structure is 39 ft (11.9 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesN3075 N Walker Ave
CrossesCreek
Location.2N of NW 36 on Walker
RouteCity Street N3075
Coordinates35.51004, -97.52104
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating21.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length39 ft (11.9 m)
Longest span12 ft (3.8 m)
Deck width40 ft (12.2 m)
Roadway width23 ft (7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic250 (2022)
Projected traffic400 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$225,000
NavigationNo navigation control on waterway

Frequently asked questions

When was N3075 N Walker Ave over Creek built?

It was built in 1995, making it 30 years old in 2025.

What condition is N3075 N Walker Ave over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does N3075 N Walker Ave over Creek carry?

About 250 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is N3075 N Walker Ave over Creek?

The structure is 39 ft (11.9 m) long with a longest span of 12 ft (3.8 m) and a deck 40 ft wide.

Who owns N3075 N Walker Ave over Creek?

It is owned by the City or Municipal Highway Agency.