US Bridges

N3130 (sooner Rd.) over Crutcho Creek

Good

Oklahoma County, Oklahoma · 2.5N SE 29th ST · Structure no. 246670000000000

Built
1997
28 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
122 ft
1 main span
Daily traffic
8,500
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

N3130 (sooner Rd.) over Crutcho Creek is a prestressed concrete stringer/multi-beam or girder carrying N3130 (sooner Rd.) over Crutcho Creek in Oklahoma County, Oklahoma. It was built in 1997, so it is 28 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,500 vehicles a day, roughly 7% of them trucks, projected to reach 13,600 by 2042. The structure is 122 ft (37.2 m) long and 60 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesN3130 (sooner Rd.)
CrossesCrutcho Creek
Location2.5N SE 29th ST
RouteCity Street N3130
Coordinates35.47229, -97.42407
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating21.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length122 ft (37.2 m)
Longest span120 ft (36.6 m)
Deck width60 ft (18.2 m)
Roadway width50 ft (15.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,500 (2022)
Projected traffic13,600 by 2042
Trucks7%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$393,000
NavigationNo navigation control on waterway

Frequently asked questions

When was N3130 (sooner Rd.) over Crutcho Creek built?

It was built in 1997, making it 28 years old in 2025.

What condition is N3130 (sooner Rd.) over Crutcho Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does N3130 (sooner Rd.) over Crutcho Creek carry?

About 8,500 vehicles per day (2022 count), of which roughly 7% are trucks.

How long is N3130 (sooner Rd.) over Crutcho Creek?

The structure is 122 ft (37.2 m) long with a longest span of 120 ft (36.6 m) and a deck 60 ft wide.

Who owns N3130 (sooner Rd.) over Crutcho Creek?

It is owned by the City or Municipal Highway Agency.