US Bridges

NW 164th St. over Creek

Good

Oklahoma County, Oklahoma · .4 MI E of Council RD · Structure no. 230120000000000

Built
1992
33 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
82 ft
1 main span
Daily traffic
300
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

NW 164th St. over Creek is a prestressed concrete stringer/multi-beam or girder carrying NW 164th St. over Creek in Oklahoma County, Oklahoma. It was built in 1992, so it is 33 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 300 vehicles a day, roughly 5% of them trucks, projected to reach 480 by 2042. The structure is 82 ft (25.1 m) long and 34 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesNW 164th St.
CrossesCreek
Location.4 MI E of Council RD
RouteCity Street E0950
Coordinates35.63851, -97.64879
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating86.8 US tons
Inventory rating42.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length82 ft (25.1 m)
Longest span77 ft (23.5 m)
Deck width34 ft (10.5 m)
Roadway width33 ft (10 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic300 (2022)
Projected traffic480 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$460,000
NavigationNo navigation control on waterway

Frequently asked questions

When was NW 164th St. over Creek built?

It was built in 1992, making it 33 years old in 2025.

What condition is NW 164th St. over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does NW 164th St. over Creek carry?

About 300 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is NW 164th St. over Creek?

The structure is 82 ft (25.1 m) long with a longest span of 77 ft (23.5 m) and a deck 34 ft wide.

Who owns NW 164th St. over Creek?

It is owned by the City or Municipal Highway Agency.