E1089 (sw 28) over Lightning Creek
FairOklahoma County, Oklahoma · .1W of Santa Fe · Structure no. 225680000000000
- Built
- 1990
- 35 years old
- Condition
- Fair
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 62 ft
- 1 main span
- Daily traffic
- 850
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
E1089 (sw 28) over Lightning Creek is a prestressed concrete box beam or girders - multiple carrying E1089 (sw 28) over Lightning Creek in Oklahoma County, Oklahoma. It was built in 1990, so it is 35 years old, younger than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 850 vehicles a day, roughly 5% of them trucks, projected to reach 1,360 by 2042. The structure is 62 ft (18.9 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was E1089 (sw 28) over Lightning Creek built?
It was built in 1990, making it 35 years old in 2025.
What condition is E1089 (sw 28) over Lightning Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does E1089 (sw 28) over Lightning Creek carry?
About 850 vehicles per day (2022 count), of which roughly 5% are trucks.
How long is E1089 (sw 28) over Lightning Creek?
The structure is 62 ft (18.9 m) long with a longest span of 60 ft (18.3 m) and a deck 40 ft wide.
Who owns E1089 (sw 28) over Lightning Creek?
It is owned by the City or Municipal Highway Agency.