US Bridges

33rd ST over I-35 under

Fair

Oklahoma County, Oklahoma · 6.0 MI N I-35 & I-44 · Structure no. 208450000000000

Built
1984
41 years old
Condition
Fair
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
202 ft
2 main spans
Daily traffic
5,000
2022 count
Owner
State
State Highway Agency

About this bridge

33rd ST over I-35 under is a prestressed concrete stringer/multi-beam or girder carrying 33rd ST over I-35 under in Oklahoma County, Oklahoma. It was built in 1984, so it is 41 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,000 vehicles a day, roughly 5% of them trucks, projected to reach 8,000 by 2042. The structure is 202 ft (61.7 m) long and 74 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries33rd ST
CrossesI-35 under
Location6.0 MI N I-35 & I-44
RouteCity Street 0
Coordinates35.62364, -97.42523
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating93 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length202 ft (61.7 m)
Longest span100 ft (30.5 m)
Deck width74 ft (22.6 m)
Roadway width64 ft (19.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,000 (2022)
Projected traffic8,000 by 2042
Trucks5%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$4.9 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was 33rd ST over I-35 under built?

It was built in 1984, making it 41 years old in 2025.

What condition is 33rd ST over I-35 under in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does 33rd ST over I-35 under carry?

About 5,000 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is 33rd ST over I-35 under?

The structure is 202 ft (61.7 m) long with a longest span of 100 ft (30.5 m) and a deck 74 ft wide.

Who owns 33rd ST over I-35 under?

It is owned by the State Highway Agency.