US Bridges

Driveway over Chisholm Creek

Fair

Oklahoma County, Oklahoma · .1 MI N. of Hefner RD · Structure no. 201380000000000

Built
1982
43 years old
Condition
Fair
inspected April 2023
Type
Culvert
Concrete
Length
40 ft
3 main spans
Daily traffic
1,500
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Driveway over Chisholm Creek is a concrete culvert carrying Driveway over Chisholm Creek in Oklahoma County, Oklahoma. It was built in 1982, so it is 43 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,500 vehicles a day, roughly 5% of them trucks, projected to reach 2,400 by 2042. The structure is 40 ft (12.2 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesDriveway
CrossesChisholm Creek
Location.1 MI N. of Hefner RD
RouteCity Street E0989
Coordinates35.58116, -97.54976
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating21.5 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length40 ft (12.2 m)
Longest span14 ft (4.3 m)
Deck width41 ft (12.4 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2022)
Projected traffic2,400 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$225,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Driveway over Chisholm Creek built?

It was built in 1982, making it 43 years old in 2025.

What condition is Driveway over Chisholm Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does Driveway over Chisholm Creek carry?

About 1,500 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Driveway over Chisholm Creek?

The structure is 40 ft (12.2 m) long with a longest span of 14 ft (4.3 m) and a deck 41 ft wide.

Who owns Driveway over Chisholm Creek?

It is owned by the City or Municipal Highway Agency.