US Bridges

E1085 (se 22 St) over Creek

Fair

Oklahoma County, Oklahoma · .1 Sunnylane on SE 22nd · Structure no. 146810000000000

Built
1960
65 years old
Condition
Fair
inspected November 2023
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
1,500
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

E1085 (se 22 St) over Creek is a concrete culvert carrying E1085 (se 22 St) over Creek in Oklahoma County, Oklahoma. It was built in 1960, so it is 65 years old, older than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,500 vehicles a day, roughly 10% of them trucks, projected to reach 2,400 by 2042. The structure is 22 ft (6.8 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesE1085 (se 22 St)
CrossesCreek
Location.1 Sunnylane on SE 22nd
RouteCity Street E1085
Coordinates35.44191, -97.44007
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.8 US tons
Inventory rating31 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length22 ft (6.8 m)
Longest span10 ft (3 m)
Deck width31 ft (9.4 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2022)
Projected traffic2,400 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$225,000
NavigationNo navigation control on waterway

Frequently asked questions

When was E1085 (se 22 St) over Creek built?

It was built in 1960, making it 65 years old in 2025.

What condition is E1085 (se 22 St) over Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does E1085 (se 22 St) over Creek carry?

About 1,500 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is E1085 (se 22 St) over Creek?

The structure is 22 ft (6.8 m) long with a longest span of 10 ft (3 m) and a deck 31 ft wide.

Who owns E1085 (se 22 St) over Creek?

It is owned by the City or Municipal Highway Agency.