Anderson Rd. over Soldier Creek
PoorOklahoma County, Oklahoma · 0.3S of Coffee Creek RD · Structure no. 119850000000000
- Built
- 1950
- 75 years old
- Condition
- Poor
- inspected April 2024
- Type
- Culvert
- Concrete
- Length
- 46 ft
- 3 main spans
- Daily traffic
- 550
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Anderson Rd. over Soldier Creek is a concrete culvert carrying Anderson Rd. over Soldier Creek in Oklahoma County, Oklahoma. It was built in 1950, so it is 75 years old, older than the Oklahoma average of 47.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 3 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 550 vehicles a day, roughly 15% of them trucks, projected to reach 880 by 2042. The structure is 46 ft (14 m) long and 34 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Culvert | 3 Serious | Loss of section, deterioration, spalling or scour have seriously affected primary structural components. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Anderson Rd. over Soldier Creek built?
It was built in 1950, making it 75 years old in 2025.
What condition is Anderson Rd. over Soldier Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in April 2024.
How much traffic does Anderson Rd. over Soldier Creek carry?
About 550 vehicles per day (2022 count), of which roughly 15% are trucks.
How long is Anderson Rd. over Soldier Creek?
The structure is 46 ft (14 m) long with a longest span of 16 ft (4.9 m) and a deck 34 ft wide.
Who owns Anderson Rd. over Soldier Creek?
It is owned by the City or Municipal Highway Agency.