US Bridges

E1030 over Nuyaka Creek

Fair

Okfuskee County, Oklahoma · 5.S .8. W Okfuskee · Structure no. 220040000000000

Built
1988
37 years old
Condition
Fair
inspected July 2024
Type
Tee Beam
Prestressed Concrete
Length
120 ft
3 main spans
Daily traffic
70
2022 count
Owner
County
County Highway Agency

About this bridge

E1030 over Nuyaka Creek is a prestressed concrete tee beam carrying E1030 over Nuyaka Creek in Okfuskee County, Oklahoma. It was built in 1988, so it is 37 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 70 vehicles a day, roughly 10% of them trucks, projected to reach 112 by 2042. The structure is 120 ft (36.6 m) long and 28 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesE1030
CrossesNuyaka Creek
Location5.S .8. W Okfuskee
RouteCounty Highway E1030
Coordinates35.52207, -96.24422
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57 US tons
Inventory rating34 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length120 ft (36.6 m)
Longest span40 ft (12.2 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic70 (2022)
Projected traffic112 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$560,000
NavigationNo navigation control on waterway

Frequently asked questions

When was E1030 over Nuyaka Creek built?

It was built in 1988, making it 37 years old in 2025.

What condition is E1030 over Nuyaka Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does E1030 over Nuyaka Creek carry?

About 70 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is E1030 over Nuyaka Creek?

The structure is 120 ft (36.6 m) long with a longest span of 40 ft (12.2 m) and a deck 28 ft wide.

Who owns E1030 over Nuyaka Creek?

It is owned by the County Highway Agency.