US Bridges

E0910 Smith Ferry over Corta Creek

Good

Muskogee County, Oklahoma · 1S .6E of HWY 64 & 69 · Structure no. 331760000000000

Built
2023
2 years old
Condition
Good
inspected May 2023
Type
Culvert
Concrete
Length
29 ft
2 main spans
Daily traffic
500
2022 count
Owner
County
County Highway Agency

About this bridge

E0910 Smith Ferry over Corta Creek is a concrete culvert carrying E0910 Smith Ferry over Corta Creek in Muskogee County, Oklahoma. It was built in 2023, so it is 2 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 500 vehicles a day, roughly 10% of them trucks, projected to reach 800 by 2042. The structure is 29 ft (8.8 m) long and 32 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesE0910 Smith Ferry
CrossesCorta Creek
Location1S .6E of HWY 64 & 69
RouteCounty Highway E0910
Coordinates35.69701, -95.389
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert9 ExcellentNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating100 US tons
Inventory rating68.8 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length29 ft (8.8 m)
Longest span14 ft (4.3 m)
Deck width32 ft (9.8 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic500 (2022)
Projected traffic800 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was E0910 Smith Ferry over Corta Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is E0910 Smith Ferry over Corta Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does E0910 Smith Ferry over Corta Creek carry?

About 500 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is E0910 Smith Ferry over Corta Creek?

The structure is 29 ft (8.8 m) long with a longest span of 14 ft (4.3 m) and a deck 32 ft wide.

Who owns E0910 Smith Ferry over Corta Creek?

It is owned by the County Highway Agency.