US Bridges

S.H. 58 over Indian Creek

Good

Major County, Oklahoma · 5.7N of JCT S.H. 8 · Structure no. 295700000000000

Built
2013
12 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
300 ft
3 main spans
Daily traffic
1,900
2022 count
Owner
State
State Highway Agency

About this bridge

S.H. 58 over Indian Creek is a prestressed concrete stringer/multi-beam or girder carrying S.H. 58 over Indian Creek in Major County, Oklahoma. It was built in 2013, so it is 12 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,900 vehicles a day, roughly 15% of them trucks, projected to reach 3,040 by 2042. The structure is 300 ft (91.4 m) long and 43 ft wide. If it were closed, the detour would be 19.9 mi (32 km).

CarriesS.H. 58
CrossesIndian Creek
Location5.7N of JCT S.H. 8
RouteState Highway 58
Coordinates36.33389, -98.26528
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating91.1 US tons
Inventory rating45 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length300 ft (91.4 m)
Longest span100 ft (30.5 m)
Deck width43 ft (13 m)
Roadway width40 ft (12.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,900 (2022)
Projected traffic3,040 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed19.9 mi (32 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S.H. 58 over Indian Creek built?

It was built in 2013, making it 12 years old in 2025.

What condition is S.H. 58 over Indian Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does S.H. 58 over Indian Creek carry?

About 1,900 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is S.H. 58 over Indian Creek?

The structure is 300 ft (91.4 m) long with a longest span of 100 ft (30.5 m) and a deck 43 ft wide.

Who owns S.H. 58 over Indian Creek?

It is owned by the State Highway Agency.