US Bridges

E0360 over West Creek

Good

Major County, Oklahoma · 5.0N2.0W of U.S.281/US412 · Structure no. 285490000000000

Built
2008
17 years old
Condition
Good
inspected February 2024
Type
Tee Beam
Concrete
Length
135 ft
3 main spans
Daily traffic
200
2022 count
Owner
County
County Highway Agency

About this bridge

E0360 over West Creek is a concrete tee beam carrying E0360 over West Creek in Major County, Oklahoma. It was built in 2008, so it is 17 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 10% of them trucks, projected to reach 320 by 2042. The structure is 135 ft (41.1 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesE0360
CrossesWest Creek
Location5.0N2.0W of U.S.281/US412
RouteCounty Highway E0360
Coordinates36.49215, -98.92917
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55 US tons
Inventory rating33 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length135 ft (41.1 m)
Longest span45 ft (13.7 m)
Deck width28 ft (8.4 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2022)
Projected traffic320 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$742,000
NavigationNo navigation control on waterway

Frequently asked questions

When was E0360 over West Creek built?

It was built in 2008, making it 17 years old in 2025.

What condition is E0360 over West Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does E0360 over West Creek carry?

About 200 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is E0360 over West Creek?

The structure is 135 ft (41.1 m) long with a longest span of 45 ft (13.7 m) and a deck 28 ft wide.

Who owns E0360 over West Creek?

It is owned by the County Highway Agency.