US Bridges

IRR 4530C over Holly Creek

Good

McCurtain County, Oklahoma · .5S 1.5W of Broken Bow · Structure no. 311100000000000

Built
2015
10 years old
Condition
Good
inspected April 2023
Type
Culvert
Concrete
Length
50 ft
3 main spans
Daily traffic
600
2022 count
Owner
County
County Highway Agency

About this bridge

IRR 4530C over Holly Creek is a concrete culvert carrying IRR 4530C over Holly Creek in McCurtain County, Oklahoma. It was built in 2015, so it is 10 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 600 vehicles a day, roughly 15% of them trucks, projected to reach 960 by 2042. The structure is 50 ft (15.2 m) long and 28 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesIRR 4530C
CrossesHolly Creek
Location.5S 1.5W of Broken Bow
RouteCounty Highway 4530C
Coordinates33.9825, -94.81167
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating36 US tons
Inventory rating21.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length50 ft (15.2 m)
Longest span16 ft (4.9 m)
Deck width28 ft (8.6 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic600 (2022)
Projected traffic960 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$225,000
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR 4530C over Holly Creek built?

It was built in 2015, making it 10 years old in 2025.

What condition is IRR 4530C over Holly Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does IRR 4530C over Holly Creek carry?

About 600 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is IRR 4530C over Holly Creek?

The structure is 50 ft (15.2 m) long with a longest span of 16 ft (4.9 m) and a deck 28 ft wide.

Who owns IRR 4530C over Holly Creek?

It is owned by the County Highway Agency.