US Bridges

IRR FAS 4533 over Creek

Good

McCurtain County, Oklahoma · 1.0 W Pickens · Structure no. 271250000000000

Built
2007
18 years old
Condition
Good
inspected May 2023
Type
Culvert
Concrete
Length
52 ft
3 main spans
Daily traffic
600
2022 count
Owner
County
County Highway Agency

About this bridge

IRR FAS 4533 over Creek is a concrete culvert carrying IRR FAS 4533 over Creek in McCurtain County, Oklahoma. It was built in 2007, so it is 18 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 600 vehicles a day, roughly 15% of them trucks, projected to reach 960 by 2042. The structure is 52 ft (16 m) long and 50 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesIRR FAS 4533
CrossesCreek
Location1.0 W Pickens
RouteCounty Highway E1805
Coordinates34.39573, -95.02695
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating36 US tons
Inventory rating21.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length52 ft (16 m)
Longest span17 ft (5.1 m)
Deck width50 ft (15.2 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic600 (2022)
Projected traffic960 by 2042
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$225,000
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR FAS 4533 over Creek built?

It was built in 2007, making it 18 years old in 2025.

What condition is IRR FAS 4533 over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does IRR FAS 4533 over Creek carry?

About 600 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is IRR FAS 4533 over Creek?

The structure is 52 ft (16 m) long with a longest span of 17 ft (5.1 m) and a deck 50 ft wide.

Who owns IRR FAS 4533 over Creek?

It is owned by the County Highway Agency.