US Bridges

I-35 over Adams St. under

Fair

McClain County, Oklahoma · 1.2 MI N JCT SH 39 · Structure no. 169390000000000

Built
1967
58 years old
Condition
Fair
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
107 ft
3 main spans
Daily traffic
15,100
2022 count
Owner
State
State Highway Agency

About this bridge

I-35 over Adams St. under is a steel stringer/multi-beam or girder carrying I-35 over Adams St. under in McClain County, Oklahoma. It was built in 1967, so it is 58 years old, older than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 15,100 vehicles a day, roughly 12% of them trucks, projected to reach 24,160 by 2042. The structure is 107 ft (32.6 m) long and 40 ft wide.

CarriesI-35
CrossesAdams St. under
Location1.2 MI N JCT SH 39
RouteInterstate 35
Coordinates35.01532, -97.37611
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating72 US tons
Inventory rating43 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length107 ft (32.6 m)
Longest span47 ft (14.3 m)
Deck width40 ft (12.2 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,100 (2022)
Projected traffic24,160 by 2042
Trucks12%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$2.1 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-35 over Adams St. under built?

It was built in 1967, making it 58 years old in 2025.

What condition is I-35 over Adams St. under in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does I-35 over Adams St. under carry?

About 15,100 vehicles per day (2022 count), of which roughly 12% are trucks.

How long is I-35 over Adams St. under?

The structure is 107 ft (32.6 m) long with a longest span of 47 ft (14.3 m) and a deck 40 ft wide.

Who owns I-35 over Adams St. under?

It is owned by the State Highway Agency.