US Bridges

IRR 4344C over Simon Creek

Fair

Love County, Oklahoma · 5. E 3. N of SH 76 · Structure no. 215070000000000

Built
1987
38 years old
Condition
Fair
inspected February 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
45 ft
1 main span
Daily traffic
100
2022 count
Owner
County
County Highway Agency

About this bridge

IRR 4344C over Simon Creek is a prestressed concrete stringer/multi-beam or girder carrying IRR 4344C over Simon Creek in Love County, Oklahoma. It was built in 1987, so it is 38 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 10% of them trucks, projected to reach 160 by 2042. The structure is 45 ft (13.7 m) long and 29 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesIRR 4344C
CrossesSimon Creek
Location5. E 3. N of SH 76
RouteCounty Highway 4344C
Coordinates33.98372, -97.33486
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.7 US tons
Inventory rating33.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length45 ft (13.7 m)
Longest span44 ft (13.4 m)
Deck width29 ft (8.8 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2022)
Projected traffic160 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$331,000
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR 4344C over Simon Creek built?

It was built in 1987, making it 38 years old in 2025.

What condition is IRR 4344C over Simon Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does IRR 4344C over Simon Creek carry?

About 100 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is IRR 4344C over Simon Creek?

The structure is 45 ft (13.7 m) long with a longest span of 44 ft (13.4 m) and a deck 29 ft wide.

Who owns IRR 4344C over Simon Creek?

It is owned by the County Highway Agency.